Case Studies
Industrial
Client was having insufficient capacity and airflow problems. We did a revamp optimization without changing the whole unit which save them cost and minimize downtime without affecting their operations.
44% ⇡
Improvement increase of
cooling capacity
Before: 104.45 KW
After: 150.69 KW
30% ⇣
Lesser chilled water usage in producing higher cooling capacity.
Lesser energy input.
Before: 100%
After: 70%
42.8% ⇡
Improvement enhancement
higher airflow
Before: 25, 200 CMH
After: 36,000 CMH
Pharmaceutical
Another successful case study for a Pharmaceutical Medicine Processing Plant Facility in Singapore which we optimize the very best of their existing equipment unit to save energy consumption and reduce operating costs.
12.1% ⇡
Improvement increase of
cooling capacity
Before: 104.46 KW
After: 117.09 KW
70% ⇣
Lesser chilled water usage in producing higher cooling capacity.
Lesser energy input
Before: 100%
After: 30%
13.33% ⇡
Improvement enhancement
higher airflow
Before: 6, 354 CMH
After: 7,200 CMH
Data Center
This is one of the largest data center in Singapore, in which they are facing limited in-coming source supply and off coil temperature problems for their few units of equipment. We truly understand that temperature is very crucial for cooling so we did an immediate detailed in depth analysis and perform an internal revamp to their existing unit to help them achieve their requirement of lower off-coil temperature with their existing in-coming supply chilled water source.
34.49% ⇡
Improvement increase of cooling capacity
Before: 66.9 KW
After: 90.1 KW
16.27% ⇣
Improvement enhancement lower off coil temperature
Before: 15.0° C
After: 12.9° C